Equipment Commissioning

Equipment Commissioning

An important part of the provision of a new water treatment plant is the proper calibration of the instrumentation and operation of equipment.

This can include:

  • Pre-functional checkout of equipment
  • Pre-functional testing of control system
  • Startup and demonstration
  • Gathering of test and validation information
  • Water analysis
  • Technical manual delivery